Simple planning. Professional results.

A new era of on-site surveys. Create precise floor plans, manage your clients and share your work from a single app.

Built for construction and engineering professionals, free to start
Ingeen floor plan editor on site
The problem

Paper-based surveying is a thing of the past

Traditional methods slow down your work and increase the chance of errors. Time to switch.

Lost paperwork

Notes taken on site are easy to misplace or lose.

Time-consuming transcription

Digitizing paper notes takes hours of extra work.

Inaccurate data

Handwritten measurements are hard to read and error-prone.

Difficult sharing

Communicating with clients is slow and cumbersome.

Features

Everything you need for on-site work

Ingeen is a complete tool that simplifies the entire survey workflow.

Ingeen floor plan editor screen

Precise floor plans on site

Draw, measure and calculate area instantly, then export to PDF or DXF.

Ingeen home screen with daily tasks

Your day at a glance

Tasks, clients and surveys in one view - everything important on the home screen.

Ingeen client detail screen

Every client in one place

Project status, contacts and linked surveys per client, at a glance.

Ingeen project status update screen

Track every project stage

Update the project status with a single tap and stay on top of your work.

And much more

Voice notes

Dictate on site - faster than typing.

Offline mode

Full functionality without internet, with automatic sync.

PDF and DXF export

Professional formats, ready to send instantly.

Easy sharing

Share plans via email or cloud services.

Ingeen home screen
Ingeen client management
The solution

Work smarter, not harder

With Ingeen, on-site surveying is simple and efficient. Every feature is designed to save you time and reduce the chance of errors.

  • Instant digital documentation
  • Professional PDF and DXF export
  • Cloud-based synchronization
  • Intuitive, easy-to-learn interface
  • Hungarian and English interface
Ingeen

Download the Ingeen app

Available on iOS and Android. Get started for free!

Freeto start
Offlinemode
HU + ENlanguage support